DBCT-loading-ship.jpg
 

DBCT P/L – The gateway to the world coal supply

SHIPPING


Contact Details

Duty Shipping Officer

24hr | 0419 024 188

Shipping Office

0800 - 1630h | (+61) 7 4943 5525


Shipping Documents

dbct ship vetting questionnaire

Terminal Pre-Arrival Questionnaire Form

Vessel Standards Information

Terminal Information Booklet

UK STANDARD CONDITIONS FOR TOWAGE AND OTHER SERVICES

Mooring Line REQUIREMENTS

Please note: all vessels berthing at DBCT will be supplied with a USB containing the above documents and a safety video. This is an important safety video about your arrival and departure at DBCT. Please ensure you watch the video and share the important safety information with your crew. The safety video can also be accessed here. Please contact shipping@dbct.com.au if you do not have the password to access the video.


Ship Movements: Hay Point

Ship movements at the Port of Hay Point are available from the Maritime Queensland website.


DBCT Technical Information

 
Wharf Details Berth 1 Berth 2 Berth 3 Berth 4
Design Vessel Maximum 220,000 t
Top of front (seaward) rail +17.98m LAT
Number of berthing dolphins 18 17
Number of mooring dolphins 4
Distance between extreme berthing dolphins 662 metres 676 metres
Distance between extreme mooring dolphins 843 metres
Maximum allowable speed of approach 230 mm/sec
Design Depth at Berth 19.6m LAT 19.0m LAT
Channel Depth at Berth min. 14.9m LAT
Non Channel Maneuvering Depth min. 13.1m LAT
Maximum predicted spring tide 7.14m
Water density range 1.020 to 1.025
Shiploader Details Shiploader 1 Shiploader 2 Shiploader 3
Loading Rate 7,200 tph 7,600 tph 8,650 tph
Maximum operating wind speed 72 kph
Maximum reach of chute from front rail 41.5 metres 43.0 metres
Fender face from front rail 7.5 metres
Maximum reach of chute from fender face 34.0 metres 35.5 metres
Shuttle travel 21.7 metres 23.2 metres
Shiploader longitudinal travel 622 metres 633 metres
Highest boom working position +12 degrees
Lowest boom working position -4 degrees -6 degrees
Shiploader Air Draft Clearance 28.5 metres less height of tide
Cyclone Security Tie down to strongpoint

# Note: Any ship which is not a gearless bulk carrier may require special applications.

* Note: This loading clearance applies to the shiploader boom when in position to load. The dimensions shown provide for a clearance of 1.0m, however location of control cabin and hatch covers should be checked for each berthing

For berthing information please contact DBCT P/L Operations on (+61) 7 4943 8444